After speaking with my dealer today to check on the status of my EQE SUV order, he sent me a screenshot from his system. I was wondering if there is a list of all of the status codes and what they mean. Also, what are the various build steps that the system will show?
Mine currently shows the following along with several other lines:
PRIMARY STATUS LF03 - FACTORY ORDER CONFIRMED
SECONDARY STATUS SA01 - ALLOCATED (WITH END CUST.)
Decade Planned23/11-1
Original Prod Decade23/11-1
Production Date11/01/2023
Dealer ETA
Factory StatusBOOKED SHIPMENT
What else can I expect to see regarding updates along the way? Are the production dates usually pretty close? He said a PO number would appear soon, but a VIN isn't assigned until it is built. I know with other vehicle manufacturers, the VIN is assigned once the build is scheduled.
Mine currently shows the following along with several other lines:
PRIMARY STATUS LF03 - FACTORY ORDER CONFIRMED
SECONDARY STATUS SA01 - ALLOCATED (WITH END CUST.)
Decade Planned23/11-1
Original Prod Decade23/11-1
Production Date11/01/2023
Dealer ETA
Factory StatusBOOKED SHIPMENT
What else can I expect to see regarding updates along the way? Are the production dates usually pretty close? He said a PO number would appear soon, but a VIN isn't assigned until it is built. I know with other vehicle manufacturers, the VIN is assigned once the build is scheduled.